Skip to content

Fix GCC compile

Fix GCC compile #166

Triggered via push October 27, 2025 21:27
Status Failure
Total duration 2m 59s
Artifacts

cmake.yml

on: push
Matrix: linux
Matrix: macos
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

7 errors
linux (clang, clang++, 18, 20)
Process completed with exit code 2.
linux (clang, clang++, 18, 23)
The strategy configuration was canceled because "linux.clang_clang___18_20" failed
linux (clang, clang++, 18, 23)
Process completed with exit code 2.
linux (g++, g++, 14, 20)
The strategy configuration was canceled because "linux.clang_clang___18_20" failed
linux (g++, g++, 14, 20)
The operation was canceled.
linux (g++, g++, 14, 23)
The strategy configuration was canceled because "linux.clang_clang___18_20" failed
linux (g++, g++, 14, 23)
The operation was canceled.