The original DIR-V Grand Challenge 2025 proposal commits to the following quarterly milestones. Status as of the latest update is shown alongside each item.

Q3 2025 — Design freeze (✅ completed)

  • Topic selection and literature review
  • Problem definition and solution architecture
  • System block diagram and subsystem interfaces
  • Online TAP-RISC simulator (this repository)
  • Bill of Materials and component selection report
  • Schematic and preliminary PCB layout design files

Output indicators:

  • ✅ Online simulator accurately models tamper events and system response
  • ✅ Full system design reviewed by mentor
  • 🔲 BOM and PCB designs ready for fabrication

Q4 2025 — First prototype

  • Fabricate first 4-layer PCB prototype
  • Assemble TAP-RISC hardware (sensors + enclosure)
  • Port simulator logic to embedded firmware on Zephyr
  • Bring-up sensor integration test setup

Output indicators:

  • 🔲 Hardware prototype boots and runs embedded firmware
  • 🔲 Successful sensor data acquisition and basic tamper event detection
  • 🔲 Initial crypto-erase logic validated on hardware

Q1 2026 — Field testing

  • Full system integration (hardware + software)
  • Controlled-environment field tests
  • Collect performance data (latency, detection accuracy)
  • Refine design based on test results

Output indicators:

  • 🔲 System passes integration tests (hardware/software co-validation)
  • 🔲 Field test results: tamper accuracy, response latency, comms range
  • 🔲 Documentation enables replication by other teams

Q2 2026 — Pilot deployment

  • Prepare pilot units for defense / smart infrastructure partners
  • Finalize documentation for open-source release
  • Engage with potential end-users
  • Submit for evaluation / feedback

Output indicators:

  • 🔲 Open-source package available on GitHub
  • 🔲 Positive feedback from pilot deployments
  • 🔲 Project presented to DIR-V / industry stakeholders

Current status

This repository represents the Q3 2025 milestone: a complete conceptual design plus a working software simulator that exercises the algorithmic core (sensor fusion, secure boot, crypto-erase, chained audit logging, encrypted alerting).

What is NOT yet done:

  • No real hardware prototype has been built.
  • No RTL or firmware has been written for the actual Artix-7 + VEGA AT1051 combination.
  • No field testing has occurred.

We were honest about this in the DIR-V Grand Challenge submission, and the project was selected as a quarterfinalist on the strength of the design and conceptual depth.